CG-3 Phase Series in Chennai
`
We know in today's highly demanding environments, clean and consistent power isn't optional, which is why our team built a high-performance CG 3-phase series designed to deliver consistent, stable power and ensure maximum uptime and superior equipment performance. We are the top CG-3 Phase Series Manufacturers in Chennai for our heavy-duty equipment, automation systems and high-capacity motors. These features ensure a smooth and efficient operation without interruption for your industrial needs.
Smart Engineering for Uninterrupted Industrial Power
DSP technology and active input power factor correction are used in the design of the CGK-3P with dual mains inputs to improve output voltage. Better power quality and performance are always guaranteed as a result. When compared to a normal UPS (built with an output power factor of 0.8), the CGK-3P is a double-conversion online UPS with an output power factor of 0.9 that offers a greater power density and 12.5% more power. In the event of an internal malfunction or overload, it incorporates an automated bypass that permits the load to be transferred to the mains. It may be configured as a T or as a single-phase input and output.
Features & Benefits
- Double conversion online UPS.
- Power factor corrector input 0.99 (PFC)
- In the event of an overload or internal malfunction, automatic bypass enables the load to be transferred to the mains.
- A 0.9 output power factor
- On 10 kVA, it may be configured as either single-phase input and output or three-phase input and single-phase output.
- Hot standby setup to guarantee mission-critical programs have access to high-quality power
- The UPS may be powered on from the battery without the need for a utility due to the battery's cold start capability.
- Up to three units can be paralleled for redundancy and/or capacity.
- Adaptable/configurable battery arrangement
Load Chart For an Office
| Load Options | 3 kVA UPS | 5 kVA UPS | 10 kVA UPS |
|---|---|---|---|
| Computer | 7–8 | 15–20 | 30–40 |
| Printer | 2–3 | 5–6 | 10–12 |
| Server | 1 | 1 | 1 |
Back up time in Minutes (Approx.)
| UPS Capacity | BATTERY SIZING | ||
|---|---|---|---|
| 12 V 26 AH | 12 V 42 AH | 12 V 65 AH | |
| 3 kVA with 8 units of battery | Back Up Time: 30–35 Min | Back Up Time: 80–90 Min | Back Up Time: 110–120 Min |
| 5 kVA with 16 units of battery | Back Up Time: 30–35 Min | Back Up Time: 80–90 Min | Back Up Time: 110–120 Min |
| 10 kVA with 16 units of battery | Back Up Time: 12–15 Min | Back Up Time: 35–40 Min | Back Up Time: 60–70 Min |
Ready to Upgrade Your Power Protection?
Ensure every operation never slows down due to voltage instability or unexpected failures, which is why our top CG 3-phase series manufacturers in Chennai provide the advanced features, UPS and batteries for high performance. Contact us today and choose the perfect system to safeguard your equipment.
Any Queries
Enquiry Now
